What is being measured | text |
---|---|
Time to fill with hydrogen | 8 mins |
Time that the motor spun | 45 mins |
When we did the Electrolysis (splitting) | 11-12 am |
Maximum H2 production rate | 8ml/min |
Hydrogen used | 20ml |
What is being measured | text |
---|---|
Time to fill with hydrogen | 8 mins |
Time that the motor spun | 45 mins |
When we did the Electrolysis (splitting) | 11-12 am |
Maximum H2 production rate | 8ml/min |
Hydrogen used | 20ml |